WM800 - WR-DCM3 - Installation/Commissioning of equipment
WM800 – WR-DCM3
Setting up
the machine
- Move display to correct position. Dismount the hanger (two M6 screws) and move/mount the hanger to the prepared holes at the side of the chassis.
- Mount the supplied side cover.
(six M6 screws)
- Level the machine by adjusting machine shoes, depending on the floor level.
- We highly recommend a stable internet connection to perform remote service and updates.
Facility hardware
- Power
Supply: 230 / 110V 16Amps
- Internet:
RJ45 plug